![]() |
| Key Staffs |
||||
| Frank K. Li, S.E. | Principal | |||
| Education: | University
of California, Los Angeles B.S. in Civil Engineering, 1992 San Jose State University M.S. in Structural Engineering, 1996 |
|||
| Registration: | California -
Civil Engineer, 1997 California - Structural Engineer, 2001 |
|||
| Professional Affiliations: |
Structural Engineers
Association of Northern California American Society of Civil Engineers |
|||
| Experience: | 12 years of extensive
professional experience in structural engineering services with specialty
in new custom homes and residential additions/remodelings. Mr. Li has served as project engineer on the following projects: Wind River Systems Corporate Campus Phase I, Alameda, CA A corporate campus consisting of five 3-stories SCBF steel frame buildings on piles and structural slab on grade. 10M Construction Cost. Old Hoover Middle School Preliminary Seismic Study, San Jose, CA Seismic evaluation using a Non-linear Static Pushover Analysis to study the feasibility of recertifing the Old Hoover Middle School, a 2-story 1920s concrete shear wall building. Town Center phase of Three-Bridges Senior Nursing Care Development, Santa Rosa, CA Four 1-or2-story masonry and wood community servicing buildings. 150M Total Development Construction Cost. Santa Rosa Memorial Hospital, Santa Rosa, CA Ongoing hospital-wide additions, renovations, and equipment anchorages. Senate Bill 1953 Hospital Seismic Evaluations Ordway Office Building, Oakland, CA Seismic study of 32-story steel moment frame building using ETABS structural analysis program. Building Restoration, San Mateo, CA Restoration of fire-damaged 2-story wood structure and seismic upgrade. 1.2M Construction Cost. |
|||
|
|
||||
|
|
|
|